Concrete Slab Calculator

This concrete slab calculator is for pads, patios, shed floors and sidewalks, including an optional gravel base: length × width × thickness gives cubic yards (square feet × inches ÷ 324). Turn on the gravel panel for base volume in cubic yards and approximate tons. Vehicle driveways have their own concrete driveway calculator.

Updated Free · no sign-up · inputs stay in your browser

Slab dimensions

Quick presets (typical, not code)
Slab 1
11.23 yd³
ft
ft
in
Waste / overage
%
Default is 0%, so the net number is the true geometry. Many people add 5–10% for uneven subgrade, form bulge, and spillage.
Gravel base under the slab
in
t
Confirm with your local material supplier.
Uses the area of slab and round-slab sections. Compaction can need more material than the loose volume.
Rebar grid (rectangular slabs)
in
in
ft
in
0 = no laps added

Not structural design. Bar size, spacing, cover, and laps come from your plans, engineer, or local code. A spacing rule often attributed to ACI 318 (lesser of 3× thickness or 18 in). Rebar inputs are in US units.

Concrete to order

1.23yd³

No waste added · 33.33 ft³

Net volume
1.235 yd³
Order volume
1.235 yd³
Cubic feet
33.33 ft³
Cubic meters
0.944 m³

Bags (rounded up after waste)

Bags needed by bag size
BagYield (ft³)Per yd³Bags
40 lb90112
50 lb7289
60 lb6075
80 lb4556

Default yields: QUIKRETE No. 1101 data sheet. Edit them to match your bag.

Gravel base
1.23 yd³
Approx. tons
1.73 t
V = L × W × T yd³ = ft³ ÷ 27 · order = net × (1 + waste) bags = ⌈order ft³ ÷ yield⌉

A slab this size is usually poured in one go. Mixing 45+ bags by hand while the first section sets is hard, so price a truck and ask about short-load fees.

Show the math
  1. Slab: 33.33 ft³
  2. Net volume: 33.33 ft³
  3. Order volume: 33.33 × (1 + 0%) = 33.33 ft³ = 1.235 yd³
  4. 80 lb bags: 33.33 ÷ 0.6 = 55.56, rounded up to 56
Concrete calculator slab diagram: length, width and thickness labeled

How to figure concrete for a slab

  1. Measure the length and width in feet. For an L-shaped slab, split it into two rectangles and add both as separate slabs.
  2. Pick a thickness in inches. Measure the form depth in a few spots, because subgrade is rarely perfectly flat.
  3. Square feet = length × width.
  4. Cubic yards = square feet × thickness (in) ÷ 324.
  5. Add waste if you want a margin, then round up to how your supplier sells.
rectangle: yd³ = L(ft) × W(ft) × T(in) ÷ 324 round slab: yd³ = π × (D ÷ 2)² × T(in) ÷ 324 4 in slab shortcut: yd³ ≈ sq ft ÷ 81

Why 324? A cubic yard is 27 cubic feet, and a foot is 12 inches, so 27 × 12 = 324. The ÷ 81 shortcut only works at exactly 4 inches. The formula guide walks through the algebra.

Worked example: 10 × 10 ft slab, 4 in thick

  1. Area: 10 × 10 = 100 sq ft.
  2. Cubic yards: 100 × 4 ÷ 324 = 1.23 yd³.
  3. Cubic feet: 1.23 × 27 = 33.33 ft³.
  4. 80 lb bags: 33.33 ÷ 0.60 = 55.6, which rounds up to 56 bags.

Common slab sizes at a glance

Net volume, no waste, 80 lb bags at 0.60 ft³ each . Yards = sq ft × thickness (in) ÷ 324.

Slab4 in5 in6 in
4 × 4 ft0.20 yd³ · 9 bags0.25 yd³ · 12 bags0.30 yd³ · 14 bags
8 × 8 ft0.79 yd³ · 36 bags0.99 yd³ · 45 bags1.19 yd³ · 54 bags
10 × 10 ft1.23 yd³ · 56 bags1.54 yd³ · 70 bags1.85 yd³ · 84 bags
10 × 12 ft1.48 yd³ · 67 bags1.85 yd³ · 84 bags2.22 yd³ · 100 bags
12 × 12 ft1.78 yd³ · 80 bags2.22 yd³ · 100 bags2.67 yd³ · 120 bags
20 × 20 ft4.94 yd³ · 223 bags6.17 yd³ · 278 bags7.41 yd³ · 334 bags
20 × 30 ft7.41 yd³ · 334 bags9.26 yd³ · 417 bags11.11 yd³ · 500 bags
30 × 40 ft14.81 yd³ · 667 bags18.52 yd³ · 834 bags22.22 yd³ · 1000 bags
24 × 24 ft7.11 yd³ · 320 bags8.89 yd³ · 400 bags10.67 yd³ · 480 bags

At these sizes a ready-mix truck usually beats bags. Compare both with your own prices in the concrete cost calculator.

Typical slab thickness

UseOften cited
Sidewalk, patio, shed pad4 in
Garage floor / light pad4–6 in
Vehicle driveway4–6 in — use the driveway calculator
Slab-on-ground minimum (IRC)3.5 in, as cited by some pages

These are typical figures, not code. Heavy vehicles, poor soil, or frost may call for more. Check your plans and your local building department. Thickness and mix strength go together: see what psi concrete to order for a driveway, and check curing times in our drive-on timeline guide.

Monolithic slab vs slab on grade

A monolithic slab pours footing and floor in one piece, so volume is the flat slab plus any thickened edge or perimeter strip. A slab on grade is the floor only, usually on a gravel base. Add thickened edges as their own section in the main calculator when they are not in your rectangle.

Slab shapes beyond rectangles

Round hot-tub pads, half-circle bump-outs, and shed pads use the round shape above. Split L-shaped patios into two rectangles and add both sections.

Sloped slabs and ramps

For a ramp or driveway section with different thickness at each end, use the sloped slab shape on the concrete calculator and enter thickness at the high and low edges.

Slab foundations, basement floors and garage floors

For a slab foundation, add the flat floor and the thickened perimeter as separate pieces; for a basement or garage floor inside existing walls, the floor alone is the whole order. Footing width, edge depth and reinforcement come from your plans or building department—this page only turns those sizes into concrete.

Worked example: 20 × 30 ft monolithic slab foundation

  1. Floor: 20 × 30 = 600 sq ft at 4 in → 600 × 4 ÷ 324 = 7.41 yd³.
  2. Perimeter edge: 100 ft long, 12 in wide, 8 in deeper than the floor → 100 × 1 × 0.667 = 66.7 ft³.
  3. Corners are counted twice along a perimeter, so subtract 4 × (1 × 1 × 0.667) = 2.7 ft³ → 64.0 ft³ = 2.37 yd³.
  4. Total: 7.41 + 2.37 = 9.78 yd³. With 5% waste, 10.27 yd³; order 10.5 yd³.

Worked example: 30 × 40 ft basement floor, 4 in

  1. Area: 1,200 sq ft.
  2. Volume: 1,200 × 4 ÷ 324 = 14.81 yd³ net.
  3. Basement floors are often poured over a gravel or crushed-stone layer that is rarely perfectly flat; with 8% waste the order is 16.0 yd³.
  4. Pump or chute access matters more than volume here—tell the plant it is a basement pour when you order.

From square footage to yards

If you already know the square footage, you can skip length and width: cubic yards = square feet × thickness (in) ÷ 324. So 1,200 square feet at 4 inches is about 14.8 yards, and the same area at 6 inches is 22.2 yards.

Square footage to cubic yards of concrete (net)
Area4 in5 in6 in
100 sq ft1.23 yd³1.54 yd³1.85 yd³
200 sq ft2.47 yd³3.09 yd³3.70 yd³
400 sq ft4.94 yd³6.17 yd³7.41 yd³
600 sq ft7.41 yd³9.26 yd³11.11 yd³
800 sq ft9.88 yd³12.35 yd³14.81 yd³
1,000 sq ft12.35 yd³15.43 yd³18.52 yd³
1,200 sq ft14.81 yd³18.52 yd³22.22 yd³
1,500 sq ft18.52 yd³23.15 yd³27.78 yd³

Triangle and circular slabs

A triangle is half of a rectangle: area = ½ × base × height. A corner patio with a 12 ft base and 9 ft height is 54 sq ft; at 4 in that is 54 × 4 ÷ 324 = 0.67 yd³. A circular slab uses area = π × radius²: a 12 ft diameter hot-tub pad (6 ft radius) is 113.1 sq ft, or 1.40 yd³ at 4 in. Mixed shapes are easiest as separate sections in the main concrete calculator.

Gravel base under a concrete slab

Tick the gravel panel for base cubic yards and approximate tons from your slab area. Depth and stone type: gravel under a concrete slab.

Worked example: 10 × 10 ft slab with a 4 in gravel base

  1. Slab area: 10 × 10 = 100 sq ft.
  2. Gravel depth: 4 in = 4 ÷ 12 = 0.333 ft.
  3. Gravel volume: 100 × 0.333 = 33.33 ft³ = 1.23 yd³ loose.
  4. At 1.4 tons per yd³ (confirm with your supplier): about 1.7 tons.

Rebar grid for a slab

Rebar does not change concrete volume in a meaningful way for ordering, but it does change what you buy. Open the rebar panel for bar count and weight, or see rebar vs wire mesh for a concrete slab to choose mesh instead of tied bar.

A reinforced concrete slab needs the same concrete volume as a plain one; slab reinforcement only adds bars or mesh, chairs and tie wire to the shopping list. Bar size and spacing should come from your plans.

Concrete slab estimator tips

  • Thickened edges and footings under the slab are extra volume. Add them as their own section in the main concrete calculator.
  • Low spots in the subgrade eat concrete. A 4 in slab poured on a base that dips to 4.5 in uses 12.5% more in that area.
  • For bags only, the concrete bag calculator shows 40, 50, 60, and 80 lb counts side by side.

Related guides

Sources

Checked October 11, 2026.

Frequently asked questions

How much concrete do I need for a 12 x 12 slab?

At 4 inches thick, a 12 by 12 ft slab is 48 cubic feet, or about 1.78 cubic yards, before waste. That is 80 bags of 80 lb concrete at 0.60 cubic feet per bag.

How thick should a concrete slab be?

Patios and sidewalks are often 4 inches. Driveways and garage floors are often 4 to 6 inches. Those are typical figures, not code. Your plans, local code, and soil decide the real thickness.

How do I figure concrete for a slab in cubic yards?

Multiply length in feet by width in feet to get square feet. Multiply by thickness in inches and divide by 324. A 10 by 10 slab at 4 inches is 100 × 4 ÷ 324 = 1.23 cubic yards.

How much gravel goes under a concrete slab?

Many slabs sit on 4 inches of compacted gravel. Gravel volume is slab area times base depth. Open the gravel base panel in the calculator, and ask your supplier for tons per cubic yard.

Is a concrete pad calculator different from a slab calculator?

No. A pad is a small slab, such as a shed base, AC pad, or hot tub pad. Use the same length × width × thickness math, or tap a preset.

How much concrete do I need for an 8x8 slab?

At 4 inches, an 8 × 8 ft slab is 64 × 4 ÷ 324 = 0.79 cubic yards, or 21.3 cubic feet. That is 36 bags of 80 lb concrete at 0.60 cubic feet per bag, before waste.

Need the gravel base too? Our gravel under concrete slab guide shows the math.

Planning a DIY concrete sidewalk? Read our walkway guide.