Concrete Wall Calculator

This concrete wall calculator finds the volume of a poured wall. Volume = length × height × thickness. Enter length and height in feet and thickness in inches. Add each wall run as its own section, and the total comes out in cubic yards and bags.

Updated Free · no sign-up · inputs stay in your browser

Walls

Wall 1
11.98 yd³
ft
ft
in
Waste / overage
%
Default is 0%, so the net number is the true geometry. Many people add 5–10% for uneven subgrade, form bulge, and spillage.

Concrete to order

1.98yd³

No waste added · 53.33 ft³

Net volume
1.975 yd³
Order volume
1.975 yd³
Cubic feet
53.33 ft³
Cubic meters
1.51 m³

Bags (rounded up after waste)

Bags needed by bag size
BagYield (ft³)Per yd³Bags
40 lb90178
50 lb72143
60 lb60119
80 lb4589

Yields are based on standard manufacturer data sheets (QUIKRETE No. 1101). The bag in your hand wins, so edit the yield.

V = L × H × T yd³ = ft³ ÷ 27 · order = net × (1 + waste) bags = ⌈order ft³ ÷ yield⌉

Over about 1 yd³, a ready-mix truck is often more practical than bags. Check truck minimums and short-load fees.

Wall volume formula

V = L(ft) × H(ft) × T(in) ÷ 12 yd³ = V ÷ 27 battered (sloped) wall: V = L × ((top T + bottom T) ÷ 2) × H

For a wall that is thicker at the base, pick the trapezoid shape and enter the top and bottom widths. The average width times the height gives the cross-section.

Worked example: 20 ft wall, 4 ft tall, 8 in thick

  1. Thickness in feet: 8 ÷ 12 = 0.667 ft.
  2. Volume: 20 × 4 × 0.667 = 53.33 ft³.
  3. Cubic yards: 53.33 ÷ 27 = 1.98 yd³.
  4. 80 lb bags: 53.33 ÷ 0.60 = 88.9, so 89 bags. A truck is likely easier here.

Walls with several runs

A foundation is often four walls of different lengths. Add each as a section. At corners, avoid double counting. Use outside lengths on two opposite walls and inside lengths on the other two.

Footings, block, and forms

Volume only. Wall thickness, height limits, and reinforcement, especially for retaining walls, come from your plans or an engineer.

Frequently asked questions

How much concrete is in a wall?

Multiply length × height × thickness with every number in feet. A 20 ft wall that is 4 ft tall and 8 inches thick is 20 × 4 × 0.667 = 53.3 cubic feet, or about 1.98 cubic yards.

How do I account for windows and doors in a poured wall?

Calculate the wall as solid, then work out each opening as length × height × wall thickness and subtract it. For small openings, many people skip the deduction and treat it as extra margin.

How thick is a typical poured concrete wall?

Residential foundation and stem walls are often 6, 8, or 10 inches thick. The right thickness depends on height, soil, and loads, so it comes from your plans or local code.