For mixed projects with several shapes, use the main concrete calculator. This concrete wall calculator finds the volume of a poured wall. Volume = length × height × thickness. Enter length and height in feet and thickness in inches. Add each wall run as its own section, and the total comes out in cubic yards and bags.

Updated Free · no sign-up · inputs stay in your browser

Walls

Wall 1
11.98 yd³
ft
ft
in
Waste / overage
%
Default is 0%, so the net number is the true geometry. Many people add 5–10% for uneven subgrade, form bulge, and spillage.

Concrete to order

1.98yd³

No waste added · 53.33 ft³

Net volume
1.975 yd³
Order volume
1.975 yd³
Cubic feet
53.33 ft³
Cubic meters
1.51 m³

Bags (rounded up after waste)

Bags needed by bag size
BagYield (ft³)Per yd³Bags
40 lb90178
50 lb72143
60 lb60119
80 lb4589

Default yields: QUIKRETE No. 1101 data sheet. Edit them to match your bag.

V = L × H × T yd³ = ft³ ÷ 27 · order = net × (1 + waste) bags = ⌈order ft³ ÷ yield⌉

Walls need a continuous pour so lifts bond. At this volume, book a truck and ask whether you also need a pump to reach the top of the forms.

Order sheet

Order volume
1.98 yd³
Rounded to 0.25 yd³
2 yd³
Trucks
1
80 lb bags
89 bags
yd³
Ask your supplier
yd³
Leave blank if you do not know the short-load minimum

Bag alternative uses the order volume before supplier rounding, at the 80 lb yield above.

Supplier: ____________________

Delivery increment: __________   Minimum load: __________   Truck size: __________

Show the math
  1. Wall: 53.33 ft³
  2. Net volume: 53.33 ft³
  3. Order volume: 53.33 × (1 + 0%) = 53.33 ft³ = 1.975 yd³
  4. 80 lb bags: 53.33 ÷ 0.6 = 88.89, rounded up to 89
  5. Supplier step 0.25 yd³ rounds 1.98 yd³ up to 2 yd³, 1 truck at 10 yd³.

Wall volume formula

V = L(ft) × H(ft) × T(in) ÷ 12 yd³ = V ÷ 27 battered (sloped) wall: V = L × ((top T + bottom T) ÷ 2) × H

For a wall that is thicker at the base, pick the trapezoid shape and enter the top and bottom widths. The average width times the height gives the cross-section.

Worked example: 20 ft wall, 4 ft tall, 8 in thick

  1. Thickness in feet: 8 ÷ 12 = 0.667 ft.
  2. Volume: 20 × 4 × 0.667 = 53.33 ft³.
  3. Cubic yards: 53.33 ÷ 27 = 1.98 yd³.
  4. 80 lb bags: 53.33 ÷ 0.60 = 88.9, so 89 bags. A truck is likely easier here.

Subtracting door and window openings

Model the wall as solid, then subtract each opening: opening volume = count × width (ft) × height (ft) × wall thickness (ft). Thickness in feet is inches ÷ 12. Small openings are sometimes skipped and treated as waste.

Worked example: 24 ft wall, 8 ft tall, 10 in thick, one 3 × 7 ft door

  1. Solid volume: 24 × 8 × (10 ÷ 12) = 160 ft³.
  2. Opening: 1 × 3 × 7 × (10 ÷ 12) = 17.5 ft³.
  3. Net: 160 − 17.5 = 142.5 ft³ = 5.28 yd³.
  4. At a 10 yd³ truck, that is one truck with room to spare; enter your truck size in the order sheet above.

ICF walls vs poured walls

Insulated concrete forms (ICF) pour into foam blocks; volume is still length × height × thickness of the concrete core. Use this tool for the core width your ICF maker specifies, not the full foam thickness.

Walls with several runs

A foundation is often four walls of different lengths. Add each as a section. At corners, avoid double counting. Use outside lengths on two opposite walls and inside lengths on the other two.

Footings, block, and forms

Concrete wall diagram: length, height and thickness

Common mistakes

  • Mixing inches and feet. Thickness is often in inches, while length and height are in feet. Divide inches by 12 before multiplying, or the volume is 12 times too big.
  • Counting a corner twice. If you measure every wall to the outside corner, the corner square is in two walls. Use outside lengths on one pair and inside lengths on the other.
  • Forgetting the footing. The wall calculator does not include the concrete under the wall. That volume belongs on the footing calculator, then the two orders add together.
  • Treating a retaining wall like a short stem wall. Height, drainage, and reinforcement change with the soil it holds. This page only estimates volume.

When to use a different calculator

Work the 20 ft × 4 ft × 8 in example above in the tool and you should see about 1.98 cubic yards before waste. If your number is far from that, check that thickness is 8 inches and not 8 feet.

Volume only. Wall thickness, height limits, and reinforcement, especially for retaining walls, come from your plans or an engineer.

Sources

Checked October 11, 2026.

Frequently asked questions

How much concrete is in a wall?

Multiply length × height × thickness with every number in feet. A 20 ft wall that is 4 ft tall and 8 inches thick is 20 × 4 × 0.667 = 53.3 cubic feet, or about 1.98 cubic yards.

How do I account for windows and doors in a poured wall?

Calculate the wall as solid, then work out each opening as length × height × wall thickness and subtract it. For small openings, many people skip the deduction and treat it as extra margin.

How thick is a typical poured concrete wall?

Residential foundation and stem walls are often 6, 8, or 10 inches thick. The right thickness depends on height, soil, and loads, so it comes from your plans or local code.

Should I use this page or the footing calculator?

Use this page for the wall itself: length, height, and thickness. Use the footing calculator for the strip of concrete under the wall. Add the two volumes if you are ordering both in one pour.