Short answer: Cubic feet = length × width × thickness (all in feet). Cubic yards = cubic feet ÷ 27. For slabs measured in square feet and inches: yards = sq ft × thickness (in) ÷ 324.
Contents: units · rectangles · 324 and 81 · round shapes · stairs and curbs · waste · bags · weight · mix · rebar
1. Get every number into one unit
Most mistakes come from multiplying feet by inches. Convert first.
YardPour displays metric volume using 0.0283168 m³ per ft³ throughout. Some sites print 0.0283. The small difference adds up on big pours, so the two are never mixed in one result.
2. Rectangles: slabs, walls, square footings
Example: 10 × 10 ft slab, 4 in thick
- 4 in ÷ 12 = 0.333 ft.
- 10 × 10 × 0.333 = 33.33 ft³.
- 33.33 ÷ 27 = 1.23 yd³.
3. The 324 and ÷ 81 shortcuts
Slabs are usually measured in feet for area and inches for thickness. Combine the two conversions into one number:
The ÷ 81 shortcut, popularized by Concrete Network, is exact at 4 inches only. At 6 inches use ÷ 54. At 5 inches use ÷ 64.8. For any other thickness, use 324.
4. Round shapes: columns, tubes, and round slabs
Example: 12 in tube form, 4 ft tall
- D = 12 in = 1 ft, so the radius is 0.5 ft.
- π × 0.5² × 4 = 3.14 ft³.
- 3.14 ÷ 27 = 0.116 yd³.
A solid column overstates a post hole, because the post takes up part of the hole. For post hole volume that subtracts the post and the gravel base, use the fence post calculator.
5. Stairs, curbs, and trapezoids
Solid stairs on grade. Each step is a box one run deep. Step k is k rises tall. Summing 1 + 2 + … + n gives n(n+1) ÷ 2. A top landing adds width × landing depth × n × rise .
Curb and gutter. Modeled as two rectangles: the curb (width × height) plus the gutter flag (width × thickness), times length. Real profiles have batters and radii. Check your agency's detail .
Trapezoid. Average the two widths: V = L × ((top + bottom) ÷ 2) × H.
6. Net volume vs order volume
Net is the geometry. Order is what you buy. A 5–10% margin is often cited for uneven subgrade, form bulge, and spillage . YardPour defaults to 0% and shows both numbers, so you choose the margin knowingly.
7. Bags
| Bag | Yield (ft³) | Bags per yd³ |
|---|---|---|
| 40 lb | 0.30 | 90 |
| 50 lb | 0.375 | 72 |
| 60 lb | 0.45 | 60 |
| 80 lb | 0.60 | 45 |
Yields as widely cited for QUIKRETE Concrete Mix No. 1101 . Some calculators publish different bags-per-yard tables. The bag in your hand is the authority.
8. Weight
150 lb/ft³ is a common planning figure. Concrete Network cites about 4,000 lb/yd³. YardPour shows 150 as an editable assumption, not a fact about your mix .
9. Mix ratios
For 1 yd³ at 1 : 2 : 3: dry 41.58 ft³, cement 6.93 ft³ (7 bags), sand 13.86 ft³, gravel 20.79 ft³. The dry factor and bag volume are rules of thumb . A ratio is not a strength specification.
10. Rebar grid (takeoff only)
A spacing limit often attributed to ACI 318 is the lesser of 3 × slab thickness or 18 in. Concrete cover against earth is often cited around 3 in . Laps are not added unless you enter a lap length. This is a quantity takeoff, not structural design.
How to figure out how much concrete you need
Short answer: To determine how much concrete you need, break the pour into simple shapes, find each volume in cubic feet, add them, divide by 27 for cubic yards, and add 5–10% for waste. That one formula for figuring concrete covers slabs, footings, posts and steps.
The concrete math never gets harder than multiplication. What changes is how you break the job apart. Use this order of work whenever you calculate the amount of concrete needed for a project with more than one part:
- Sketch the pour and label each piece as a rectangle, cylinder, triangle or step.
- Write every dimension in feet before you multiply.
- Apply the matching concrete equation from the table below to each piece.
- Add the pieces, divide by 27, then apply waste once to the total.
- Convert to bags (cubic feet ÷ bag yield) if you are mixing by hand.
| Piece | Equation (ft³) |
|---|---|
| Slab, wall, square footing | L × W × D |
| Round column, post hole, tube | π × (diameter ÷ 2)² × depth |
| Triangle pad | ½ × base × height × D |
| Straight stair run | width × Σ (step height × cumulative run) |
| Sloped slab | L × W × (D₁ + D₂) ÷ 2 |
Worked example: shed pad plus four piers
- Pad: 10 × 12 ft at 4 in → 10 × 12 × 0.333 = 40.0 ft³.
- Piers: four 10 in holes, 3 ft deep → 4 × π × (0.417)² × 3 = 6.54 ft³.
- Total: 46.5 ft³ ÷ 27 = 1.72 yd³ net.
- With 10% waste: 1.90 yd³. As 80 lb bags (0.60 ft³ each): 46.5 × 1.10 ÷ 0.60 = 85.3, so 86 bags.
At 86 bags the job is close to two yards, so price a short ready-mix load against bags before you work out how much concrete you need by hand for the rest of the project.
How to measure for the amount of concrete needed
Measure the inside of the forms, not the outside of the boards. For depth on uneven ground, take readings on a 3–4 ft grid and average them; a slab that averages 4.5 in instead of 4 in needs 12.5% more concrete. Formulas for estimating concrete are only as good as these readings.
Thickness: typical, not code
Sidewalks and patios are often 4 in. Driveways and garages are often 4–6 in. Some pages cite an IRC slab-on-ground minimum of 3.5 in . Footing depth has no national default and depends on frost depth and your building department.
Put it to work
The concrete calculator runs every formula on this page, and the slab, yard, and bag tools focus on one job each.
Sources
- Portland Cement Association, Design and Control of Concrete Mixtures (overview)
- QUIKRETE Concrete Mix No. 1101 data sheet (40 / 50 / 60 / 80 lb yields)
Checked October 11, 2026.
Frequently asked questions
What is the formula for calculating concrete?
Volume = length × width × thickness, with every number in feet. Divide cubic feet by 27 to get cubic yards. For round shapes, use π × radius² × height.
Why do you divide by 27 for concrete?
A cubic yard is 3 ft × 3 ft × 3 ft, which is 27 cubic feet. Dividing cubic feet by 27 converts to cubic yards, the unit ready-mix is sold in.
Where does the 324 in the concrete formula come from?
When thickness is in inches, you divide by 12 to get feet and then by 27 to get yards. 12 × 27 = 324, so cubic yards = square feet × inches ÷ 324.
How do I work out how much concrete I need for a slab?
Multiply square feet by thickness in inches and divide by 324 to get cubic yards. A 12 × 12 ft slab at 4 inches is 144 × 4 ÷ 324 = 1.78 yd³ before waste.