YardPour

Strip footings · pier pads

Concrete Footing Calculator

This concrete footing calculator finds the volume of continuous strip footings and square pier pads. Volume = length × width × depth, times the number of pads. Results come in cubic yards and bags. It calculates concrete for a size you already have. It does not design the footing. Many crews call the same pour a footer; the math is identical.

Updated Free · no sign-up · inputs stay in your browser

Footings

Footing 1
11.32 yd³
ft
in
in
Footing 2
20.59 yd³
in
in
Waste / overage
%
Default is 0%, so the net number is the true geometry. Many people add 5–10% for uneven subgrade, form bulge, and spillage.

Concrete to order

1.91yd³

No waste added · 51.56 ft³

Net volume
1.909 yd³
Order volume
1.909 yd³
Cubic feet
51.56 ft³
Cubic meters
1.46 m³

Bags (rounded up after waste)

Bags needed by bag size
BagYield (ft³)Per yd³Bags
40 lb90172
50 lb72138
60 lb60115
80 lb4586

Default yields: QUIKRETE No. 1101 data sheet. Edit them to match your bag.

V = L × W × D V = S × S × D × quantity yd³ = ft³ ÷ 27 · order = net × (1 + waste) bags = ⌈order ft³ ÷ yield⌉

Footings are best poured in one session with no cold joints. Past a yard, a truck parked near the trench is usually easier than batches of bags.

Show the math
  1. Strip footing: 35.56 ft³
  2. Square footing: 16 ft³
  3. Net volume: 51.56 ft³
  4. Order volume: 51.56 × (1 + 0%) = 51.56 ft³ = 1.909 yd³
  5. 80 lb bags: 51.56 ÷ 0.6 = 85.93, rounded up to 86
Strip footing diagram: width, depth and length

Footing volume formulas

strip (continuous) footing: V = L(ft) × W(in) ÷ 12 × D(in) ÷ 12 square pad / pier footing: V = S(in) ÷ 12 × S(in) ÷ 12 × D(in) ÷ 12 × count yd³ = ft³ ÷ 27

For a perimeter footing, use the total length around the building. At corners, measuring outside lengths counts the corner blocks twice, so measure one pair of walls outside-to-outside and the other pair inside-to-inside.

Worked example: strip footing plus four pier pads

  1. Strip: 40 ft × (16 ÷ 12) ft × (8 ÷ 12) ft = 35.56 ft³.
  2. Pads: 4 × 2 ft × 2 ft × 1 ft = 16.00 ft³.
  3. Total: 51.56 ft³ ÷ 27 = 1.91 yd³ net.
  4. 80 lb bags: 51.56 ÷ 0.60 = 85.9, so 86 bags. At almost 2 yards, a truck is likely easier.

Worked example: perimeter footing for a 12 × 16 ft shed

  1. Footing: 12 in wide, 10 in deep, all the way around.
  2. Run length: measure the two 16 ft sides outside-to-outside and the two short sides inside-to-inside, 12 − 2 × 1 = 10 ft each. Total 52 ft, not the 56 ft you get by adding the outside dimensions.
  3. Volume: 52 × 1 × (10 ÷ 12) = 43.33 ft³ = 1.60 yd³ net.
  4. With 10% waste: 47.67 ft³ (1.77 yd³), or 80 bags of 80 lb mix.

Adding the outside lengths would count each corner twice and overbuy by about 3.3 ft³. That's roughly six bags you'd carry home and back.

Strip footing sizes: concrete per 10 ft of run

Net volume for 10 ft of continuous footing. The bag column adds 10% waste and uses 0.60 ft³ per 80 lb bag. Multiply by your run length ÷ 10.

Width × depthft³ per 10 ftyd³ per 10 ft80 lb bags per 10 ft
12 × 6 in5.000.18510
12 × 8 in6.670.24713
16 × 8 in8.890.32917
16 × 10 in11.110.41221
20 × 10 in13.890.51426
24 × 12 in20.000.74137

These are common sizes, not recommendations. Your plans or local code set the width and depth.

Concrete foundation calculator: what to include

Rebar in footings

Footing rebar is sized on your drawings or by code—this page outputs concrete volume only. For bar count on a slab, use the slab calculator rebar panel or rebar vs wire mesh.

Footing size and depth

Footing size comes from loads and soil bearing capacity. Depth comes from the frost line and local code. Older rules of thumb, such as making a footing twice the wall width, show up online, but they are not a substitute for your plans . Some codes publish minimum footing tables for light-frame houses. Check the edition your jurisdiction uses . For the compressive strength to specify for footings and flatwork, see our field guide to concrete psi for footings and driveways.

Building on the footing? See how to build a cinder block wall from footing to cap.

This is a volume tool, not structural design. It does not check bearing, reinforcement, frost depth, or code compliance.

Sources

Checked October 11, 2026.

Frequently asked questions

How much concrete do I need for a footing?

Multiply length × width × depth in feet. A 40 ft strip footing that is 16 inches wide and 8 inches deep is 40 × 1.333 × 0.667 = 35.6 cubic feet, or 1.32 cubic yards.

How deep should a concrete footing be?

There is no single national number. Footings usually need to sit below the local frost line and on undisturbed soil. Your building department, plans, or engineer set the depth and size.

Is a footer the same as a footing?

Yes. Footer is a common regional word for a footing, the wide concrete base that spreads a wall or post load into the soil.

Can this calculator size my foundation?

No. It calculates concrete volume for the size you enter. Footing width, depth, and reinforcement depend on loads and soil, which need your plans, local code, or an engineer.